Model No.: Goulds 3196
Surface Treatment: Spray-Paint
Surface Roughness: Ra6.3
Standard: ANSI
Certification: CE, RoHS, ISO 9001:2000, ISO 9001:2008
Delivery Time: 30 Days
HS Code: 84139100, 84139100
Certificate: BV and ISO 9001
Machining: CNC Machining
Testing: Dynamic Balancing, Hydro Test, PT, UT
Sample: Available for Trial
Material: Stainless Steel, Alloy Steel, Carbon Steel
OEM: Available
Main Market: USA, Canada, South Africa, Israel, and More
Weight: Up to 10 Tons via Sand Casting
Trademark: ZLT
Transport Package: Customized Based on Customer Needs
Specification: 6", 8", 10", 13", 15"
Origin: Zibo, Shandong Province, China
ANSI Goulds 3196 Pump Bearing Housing:
Part Description | Size | Type | HP No. | Material |
Goulds 3196 Bearing Housing | STX | Standard | G1201 | DCI |
Goulds 3196 Bearing Housing | MTX | Standard | G2201 | DCI |
Goulds 3196 Bearing Housing | LTX | Standard | GLT201 | DCI |
Professional Manufacturer of ANSI Goulds 3196 and Durco Parts in China |
We supply casing, impeller, shaft, cover, bearing housing, bearing frame, and more. |
OEM castings based on customer drawings or samples. |
Offering sand casting, investment casting, and lost foam casting services. |
Comprehensive machining and manufacturing solutions available. |
ANSI Goulds Pump Bearing Housing Made by Sand Casting:

Zibo Qingdong Machinery (Zibo ZLT International) has been in the casting and machining industry for over 10 years.
All production processes are strictly controlled under our ISO 9001:2008 certified quality management system.
We provide a wide range of casting parts and CNC machining services, including lost wax, investment, sand casting, and more.
Rich experience in OEM services.
Our products have been exported to over 30 countries, with strong market knowledge, especially in Europe, North America, Australia, and Canada.
Our Commitment & Responsibility:
1. Competitive Pricing
2. Strict Quality Control
3. Quick Response to Inquiries, Complaints, and Technical Issues
4. Timely Delivery



For Goulds 3196 pump impellers, please let us know the model, material, and quantity you need.
For other OEM parts, your drawings or samples will be very helpful. Usually, it takes 30 days to make the mold pattern, and another 30 days after sample confirmation.
If you have any questions, feel free to contact us.
Visit our website: www.zltgroup.com
Huaian Yige New Material Co., Ltd. , http://www.cnygplastic.com