New squad for Gurnee (more)

Here are updated production photos of the new fire truck squad being assembled by E-ONE for Gurnee, order #140715. These images give a closer look at the ongoing construction process and showcase the progress being made on this important piece of emergency equipment.

Fire truck being built

E-ONE photo

Fire truck being built

E-ONE photo

Fire truck being built

E-ONE photo

Fire truck being built

E-ONE photo

Fire truck being built

E-ONE photo

Fire truck being built

E-ONE photo

These shots highlight different stages of assembly, from the chassis to the body and pump system. The attention to detail is evident, and it's clear that E-ONE is delivering a high-quality unit tailored to the needs of the Gurnee Fire Department. Stay tuned for more updates as the project moves forward.

Thermoplastic Polyurethane Hose And Tube

Thermoplastic Polyurethane Hose And Tube,Polyurethane Tpu Tube,Polyurethane Resin Systems,Fast Molding Pu Chemical

Xuchuan Chemical , https://www.xctpu.com

Posted on